Written and reviewed by Devendra Kumar Malhotra, Registered Valuer (Plant & Machinery), IBBI/RV/05/2018/10424 | Sapient Services Pvt. Ltd., New Delhi | Last reviewed: November 2026
Your EPCG machinery is installed. DGFT still wants proof, and that proof is the EPCG installation certificate. Until it is filed, the export obligation cannot be closed and the bond or bank guarantee stays with Customs. Check the date of your last Bill of Entry first, because the three-year clock runs from the completion of import.
Sapient Services issues the EPCG installation certificate in Delhi through Chartered Engineers working from our office in Okhla Phase II, New Delhi. We inspect factories across Delhi NCR and arrange visits in other states. The window is three years from completion of import. Mismatched serial numbers and addresses can hold up a filing, so we check them before the visit.
Request a free consultation: call +91 9540162888
Quick answer: The EPCG installation certificate confirms that machinery imported at zero duty is installed at the factory named in your authorisation. An authorisation holder must produce one for imported capital goods, whether they sit at the holder’s own unit or at a supporting manufacturer’s. File it with the DGFT Regional Authority within 3 years of completing the import (HBP para 5.04(a)). Sapient’s Chartered Engineers issue it in 5 to 7 working days after documents and site inspection.
It is a written confirmation that imported capital goods are installed at the premises declared in the EPCG authorisation (often called the EPCG licence), or at the endorsed supporting manufacturer’s premises. Para 5.04 of the Handbook of Procedures 2023 requires it. The jurisdictional Customs authority or an independent Chartered Engineer can issue it, at your option. An engineer’s certificate goes to the Regional Authority, with a copy to Customs.
What counts as capital goods is defined in FTP 2023, and Appendix 5F lists goods excluded from the scheme. Chartered Engineers usually issue the certificate on their own letterhead, so ask your Regional Authority if it wants a specific format. An EPCG installation inspection usually checks and records:
An authorisation holder who has imported capital goods under EPCG must produce one. These groups come to us:
Our engineers cover manufacturing, pharma, engineering goods, healthcare equipment, food processing, textiles and export-linked services. If your three years are nearly up, start now. After year three you need the Regional Authority’s permission and a composition fee of Rs 10,000 for each year of extension.
Standard turnaround is 5 to 7 working days from complete documents and site inspection. Priority processing in 2 to 3 working days is available, subject to site access.
Get a project estimate within 24 business hours: call +91 9540162888
The standard case. The Chartered Engineer inspects the machines at the address on your authorisation and matches each serial number to the Bill of Entry. Each shipment under the authorisation is covered.
HBP para 5.04 allows installation at the premises of the holder or of the supporting manufacturer. The inspection and the certificate cover the supporting manufacturer’s premises endorsed on your authorisation.
During the export obligation period you may shift capital goods to another unit listed on your IEC and RCMC. You then submit a fresh installation certificate to the Regional Authority within six months of the shift.
Public Notice 15/2024-25 deleted para 5.04(b), the separate rule for spares. The amended para 5.04(a) now governs the installation certificate.
If your authorisation was issued under an earlier policy, do not assume the current three-year rule sets your deadline. We check the provisions that applied to that authorisation before we advise.
| Situation | Rule | Source |
|---|---|---|
| Capital goods and spares, authorisation under FTP 2023 | Certificate within 3 years of completing the import | HBP 2023 para 5.04(a), Public Notice 15/2024-25 (25 July 2024) |
| Filing after year 3 | Regional Authority may extend up to the valid EO period; composition fee Rs 10,000 per year | HBP para 5.04(a) |
| Machinery shifted to another unit | Fresh certificate within 6 months of the shift; both addresses on IEC and RCMC | HBP para 5.04 |
| Authorisation issued under FTP 2015-20 or earlier | Provisions that applied at issue; do not assume the three-year rule | Confirm with your Regional Authority |
The choice is yours. Many holders choose a Chartered Engineer because a visit can be booked around production.
| Factor | Independent Chartered Engineer | Jurisdictional Customs authority |
|---|---|---|
| Who decides | The authorisation holder | The authorisation holder |
| Scheduling | Fixed with you | Depends on officer availability |
| Copy to Customs | Required; we prepare it | Not needed |
| Engineer’s competence | Matched to your machinery | Not applicable |
Installation is one stage of a six-year file. This table shows where the certificate sits and where we support you.
| Stage | Rule | Where Sapient helps |
|---|---|---|
| Import window | 24 months from issue, no revalidation (FTP para 5.01) | The Chartered Engineer certificate for your EPCG licence |
| Installation | Certificate within 3 years of import; goods stay under an actual user condition until the EODC (FTP para 5.03) | The certificate and the Customs copy |
| Export obligation | Specific EO of 6 times the duty saved over 6 years (FTP para 5.01). First block, years 1 to 4: at least 50% (HBP para 5.13). Average EO each financial year (FTP para 5.04) | Advice on records to keep |
| EO report | Online after the first block, until EO expiry, certified by a CA, Cost Accountant or Company Secretary (HBP para 5.14) | Advice on supporting documents; your CA certifies |
| EODC | Apply on ANF 5B; the Regional Authority ordinarily processes within 30 days, and an incomplete file slows that (HBP para 5.20); the online EODC goes to ICEGATE for action by the Customs authority holding the BG or LUT | EODC document support and follow-up with Customs |
FTP 2023 remains in force. Two August 2026 notices affect closure. Trade Notice 15/2026-27, dated 5 August 2026, removes the physical challan for voluntary duty payments made on or after 1 August 2026, so EODC and closure applications under Advance Authorisation and EPCG rely on authenticated digital records. Trade Notice 21/2026-27, dated 21 August 2026, introduced an automated facility for EO extensions in specified Advance Authorisation and EPCG cases considered by the PRC or EPCG Committee.
Sapient Services Pvt. Ltd. works from Sapient House, S-15, Pocket S, Okhla Phase II, New Delhi 110020. Our engineers cover Delhi NCR industrial areas and offer pan-India coverage through our network.
Before you hire anyone for EPCG consultancy, ask these questions. Our answers sit in the last column.
| Ask any provider | Why it matters | Our answer |
|---|---|---|
| Who signs the certificate, and in which field are they competent? | The certificate has to match the authorisation and the import records | An engineer matched to your machinery type signs and seals it |
| Do you check serial numbers and the address before the visit? | A mismatch with the Bill of Entry or the authorisation draws a query | Document matching before the visit is part of our process |
| Can I read the draft before it is final? | Errors are cheaper to fix before issue | Yes. You review the draft against your authorisation |
| Who prepares the Customs copy? | A Chartered Engineer’s certificate must also go to Customs | We prepare it |
| What happens if I am past the three years? | Extension needs the Regional Authority’s permission and a fee | We confirm the rule for your authorisation and prepare the request |
| What comes after the certificate? | The EO report and EODC need records built years earlier | We advise on EO tracking and the EODC document set |
We quote each project in writing before work starts, with transparent, project-specific pricing. Price depends on the points below. We do not publish a flat rate because a single-machine unit in Okhla and a multi-line plant in another state are different jobs.
| Factor | How it changes the price |
|---|---|
| Factory location | Travel from Delhi for outstation visits |
| Number of machines and authorisations | Several items or authorisations in one visit can be bundled |
| Machinery type | Specialised sectors need a domain-matched engineer |
| Urgency | Priority processing (2 to 3 working days) is priced separately |
| Late filing | Extra document work and Regional Authority liaison |
The composition fee of Rs 10,000 per year applies only if you file after the third year. Check the DGFT portal for any upload charge before you file.
Get a free written quote within 24 business hours: send your authorisation number and factory location to valuation@sapientservices.com
| Mistake | What happens | How we prevent it |
|---|---|---|
| Serial number or factory address differs from the Bill of Entry or authorisation | The Regional Authority raises a query and the filing stalls | We compare all three documents before the engineer visits |
| Machinery moved to another unit without a fresh certificate | The new location has no certificate on record | We flag shifting early and plan the six-month filing |
| Counting the three years from the first shipment | The window runs from completion of import, so phased imports are easy to miscount | We note your last import date and confirm it with your authorisation |
| Following an old article that says six months | Holders panic about a deadline that no longer applies, or ignore one that does | We cite the HBP paragraph and public notice for your authorisation |
| An engineer who does not know the machinery | Serial numbers and specifications can be missed at inspection | We assign an engineer by machinery type |
The limit is three years from completion of import, under HBP para 5.04(a) as amended by Public Notice 15/2024-25 on 25 July 2024. The earlier rule was six months, and many websites still quote it. An authorisation issued under an older policy may carry a different limit, so check the policy period on yours.
An independent Chartered Engineer or the jurisdictional Customs authority, at your option. If you use an engineer, a copy of the certificate goes to the jurisdictional Customs authority.
The fee depends on the factory location, the number of machines and authorisations, the machinery type and how fast you need it. We quote in writing before work starts. A composition fee of Rs 10,000 per year applies only if you file after the third year.
Our standard turnaround is 5 to 7 working days from complete documents and site inspection. Priority processing takes 2 to 3 working days, subject to site access.
Keep ready your EPCG authorisation, the Bill of Entry for each shipment, the commercial invoice and packing list, machine specifications with serial numbers, factory address proof, a floor plan showing where each machine stands, your IEC, and any DGFT or Customs correspondence on the authorisation. If something is missing, tell us at the start and we will advise on the next step.
Yes. You may shift capital goods to another unit listed on your IEC and RCMC during the export obligation period. You must then submit a fresh installation certificate to the Regional Authority within six months of the shift.
The Regional Authority may allow an extension up to the valid export obligation period, with a composition fee of Rs 10,000 for each year. For older authorisations, we first check which policy applies and whether any DGFT relief is open. File the request early, since the fee grows with each year.
Treat it as part of your closure file. The EODC application goes on ANF 5B, and we check your documents against the form’s list before you apply. Once the file is complete, the Regional Authority ordinarily processes the application within 30 days under para 5.20.
The nexus certificate is a Chartered Engineer’s statement, in Appendix 5A, that links the machinery you plan to import to your export products. You need it before the authorisation is issued. The installation certificate comes after import and confirms the goods are installed. For the first, see our Chartered Engineer certificate for EPCG licence page.
Yes. Our office is in Okhla Phase II, New Delhi, and we arrange site inspections in other states through our network of Chartered Engineers. Send the factory location with your request and we will confirm the engineer and the visit date.
Sapient Services Pvt. Ltd. is a New Delhi professional services firm offering chartered engineering, valuation and DGFT compliance services. We issue EPCG installation certificates for exporters in Delhi, across Delhi NCR and pan-India through our engineer network.
The three-year window runs from the completion of your import. Check the date of your last Bill of Entry today. If it is close, or already behind you, call us before the Regional Authority asks.
Regulatory note: EPCG requirements depend on the policy period, the terms of your authorisation and later DGFT amendments. This page is general information. Check the provisions that apply to your authorisation, or ask us to.